The Cube site before construction seen from the wash

This small concrete slab with the ruins of brick walls was on the site when we acquired it

The slab, now clear of debris will become the foundation for the shed

Stakes marking the edge of a new concrete slab that would extend to the East and South of the original slab. A crew of local was to pour and finish the job. The rocks in the foreground will be incuded in the concrete

The completed slab extension with the limber delivered and stockpiled, ready to build the Cube

The orginal slab now doubled in size

The footprint of the Cube marked out on the extended slab

Power tools are being run off a generator beacuse there is no photovoltaic system installed yet. First the shed must be built

Laying the mudsills for the shed

<

>

2 - 9