The North porch in its original state

Deterioration wood and inadequate support beams

Many of the 1 x 4 slats were warped

After the old structure was dismantled new supporting posts and beams were installed

Metal tie plates secure the beams to the wall

The beginnings of an access ladder

 2 x 4 slats were installed leaving a a gap

The hatch set aside to allow access

The hatch in closed position and with a recessed handle added

The East view from the sleeping platform

Final detail on the inside of the triangular truss

Two dowels provide a hand grip to help climbing onto the platform

The ladder ties in with the rows of cedar boards on the building exterior

Dan heads for the beach after working hard on the porch

<

>

14 - 14

RETURN TO EXTERIOR RENOVATIONS