Framing plan for North wall of shed. Note the sliding door hung from a rail

Framing plan of West wall of shed. Hand-drawn notations show the correct way to frame a corner

Framing the South wall. Temporary braces hold the structiure upright

The East wall frame is added

Framing for three walls in place

John about to add a junction box to connect the electrical feed from the panels. The sliding door panel has not yet been mounted

Ben adding finishing touches to the eaves

Eight solar panels in place

Finished shed with slats added to the insect screen vent on the North wall—view from the first floor of the incomplete Cube with the original water tank structure

The shed becomes the power source for the remaining construction

<

>