Trenching and laying the 1 inch pvc pipe to connect to the Cube

Roger installs the interconnecting pipes

Securing the final link

Angie checks progress

The water level indicator

Roger signs off on the level indicator

The completed setup with tie-down cables to prevent wind carrying away empty tanks

The water supply from the tank farm enters the Cube via the blue pipe under the corner of the propane hutch

The water pump connected to the roof tank with shunt, ball valve and brass check valve

Long shot of the system in place

<

>